Title page for ETD etd-11032006-132926


Type of Document Master's Thesis
Author Bishop, Catherine Elizabeth
Author's Email Address bshp_cthrn@yahoo.com
URN etd-11032006-132926
Title Resource Recovery of Coal Bed Methane Formation Water
Degree Master of Science (M.S.)
Department Environmental Studies
Advisory Committee
Advisor Name Title
Ralph J. Portier Committee Chair
Ed Overton Committee Member
Paul Templet Committee Member
Keywords
  • bioremediation
  • coal bed methane formations
  • total chromatographic hydrocarbons
  • water reclamation
  • produced water
Date of Defense 2006-10-24
Availability unrestricted
Abstract
During the excavation of natural gas, petroleum hydrocarbon-polluted brine water, termed production water, is drawn from the coal bed methane formations (CBMF) along with the natural gas product. The water is drawn out in vast amounts and re-injected into the CBMF. In the Greater Rocky Mountain Region (GRMR) where water supplies are dwindling, the remediation of CBMF production water has become a high priority for maintaining agriculture, residential development and industrial expansion.

The overall objective of this research was to demonstrate in laboratory and field pilot studies the efficacious merging of Immobilized Microbe BioReactor (IMBR) technologies for biodegradation/mineralization of organics and Reverse Osmosis (RO) technologies as a cost-efficient and effective method for the desalination of CBMF water. Laboratory studies indicated that organic constituents of concern could be reduced at a kinetic rate of 1,230 399 mg/L/h at the EnCana site and 140 120 mg/L/h based on ConocoPhillips drill pit analysis. Salinities in the residual brine were only reduced from 220 ppm to 120 ppm total chlorides with the RO system working at a continuous flow rate of 7.6 0.04 L/min. Chemical oxygen demand (COD) was reduced at a rate of 2,580 1,940 mg/L/h. A field pilot established in Parachute, CO consisted of a 836 L IMBR operating at a feed rate of 6.50 1.84 L/min. Samples were received from one collective drill pit at the EnCana Oil and Gas Company site in Parachute, CO and five separate drill pits from the ConocoPhillips fields in the San Juan Basin near Farmington, NM.

Acceptability of the production water treatment system proposed in this project was analyzed based on percent removal of Total Chromatographic Hydrocarbons (TCH) and salinity. In both the EnCana and ConocoPhillips pilot studies, the proposed treatment yielded a significant difference (P < 0.05) in TCH concentrations between the influent and effluent samples. Desalination of production water using a RO system was analyzed in the ConocoPhillips pilot study and did not show a significant difference (P > 0.05) between influent and effluent water samples.

Files
  Filename       Size       Approximate Download Time (Hours:Minutes:Seconds) 
 
 28.8 Modem   56K Modem   ISDN (64 Kb)   ISDN (128 Kb)   Higher-speed Access 
  Bishop_thesis.pdf 1.25 Mb 00:05:47 00:02:58 00:02:36 00:01:18 00:00:06

Browse All Available ETDs by ( Author | Department )

If you have questions or technical problems, please Contact LSU-ETD Support.